Project

General

Profile

Refactoring #3826

Repeat of reservation periods

Added by Sven Vanpoucke about 8 years ago. Updated almost 8 years ago.

Status:
New
Priority:
Normal
Assignee:
-
Start date:
23/08/2011
Due date:
% Done:

0%

Estimated time:

Description

The repeat functionality for reservation periods now works by fysically creating each repeat as a new reservation period. This can create a lot of overhead because it generates many reservation periods and an edit in the repeat process is not possible afterwards. This should be changed so the repeat is stored into the reservation period and the repeat periodes are calculated from it.

History

#1

Updated by Stefaan Vanbillemont almost 8 years ago

  • Target version set to Backlog (default)

Also available in: Atom PDF